Route 2020 comprises 15 km-long lines, of which 11.8 km will be elevated section and the remaining 3.2 km underground. This route is designed to cover populated areas in the city to make commutation easy for the visitors and the residents of Dubai not only during the six-month world fair but also in the future.

The new stations are of four different types and respond to different contexts:

  1. Interchange station connecting to the existing line
  2. Three elevated stations on viaduct located in districts with low population density
  3. Two underground stations located in a new district under development
  4. Iconic station of the 2020 World Expo site.

Our works in Gold Line Metro included:

  1. Management and workforce for the execution of in-situ works
  2. Erection and dismantling of formwork & scaffolding works
  3. Fixing of ready-cut and bend steel reinforcement
  4. Pouring and finishing of ready-mix concrete

PROJECT NAME: ROUTE 2020 – DUBAI METRO RED LINE EXTENSION
LOCATION: DUBAI, UAE
CLIENT: A JOINT VENTURE OF ACCIONA INFRAESTRUCTURAS AND GULERMAK (CWJV)
SCOPE: STRUCTURAL WORKS – REINFORCED CONCRETE
DURATION: JULY 2017 – AUGUST 2019
STATUS: COMPLETED