MURES BRIDGE

MURES BRIDGE

MURES BRIDGE


ROMANIA

Type
Transport
In Progress
Bedrooms
ASTALDI - FCC - SALCEF - THALES (JV) Bedrooms
JULY 2019 - PRESENT Guest
Bathrooms
STRUCTURAL WORKS – REINFORCED CONCRETE Baths
Area
ONGOING Garage

The work is included in the plan for the rehabilitation of the Brasov – Simeria (Romania) railway line, part of the IV PAN-EUROPEAN corridor for train traffic with a maximum speed of 160 km/h. The Sighisoara-Atel section runs through the provinces of Mures and Sibiu. The total length of the project is 94.75 km, of which 28.22 km correspond to the reference section.
The section to be rehabilitated is an electrified double-track section. The types of work included in the project are earthworks, consolidation, superstructure, bridges, overpasses, underpasses with prefabricated, line electrification, power supply, lighting, railway telecommunication, civil construction, roads, and highways, environmental protection.

Works executed include:

  1. Management and workforce for the execution of in situ works
  2. Erection and Dismantling of Formwork & Scaffolding works
  3. Fixing of ready-cut and bend steel reinforcement
  4. Pouring and finishing of ready-mix concrete

PROJECT NAME: MURES BRIDGE
LOCATION: BARZAVA, ROMANIA
CLIENT: ASTALDI – FCC – SALCEF – THALES (JV)
SCOPE: STRUCTURAL WORKS – REINFORCED CONCRETE
DURATION: JULY 2019 – PRESENT
STATUS: ONGOING

Related Projects