GREEN LINE METRO “EDUCATION LINE”

GREEN LINE METRO “EDUCATION LINE”

GREEN LINE METRO “EDUCATION LINE”


QATAR

Type
Transport
Completed
Bedrooms
A JOINT VENTURE OF PORR – HBK – SAUDI BINLADEN GROUP Bedrooms
APRIL 2015 – AUGUST 2015 Guest
Bathrooms
STRUCTURAL WORKS – REINFORCED CONCRETE Baths
Area
COMPLETED Garage

Doha Metro is an integral part of the Qatar Rail Development Program (QRDP).  The first phase included the construction of three out of the four lines (Red, Gold, and Green) and 37 stations, with an approximate overall length of 76 km.

The Green Line, called also the “Education Line” project consists of 16.6km of twin bored tunnels, 8 underground stations, built at a depth of 20 meters. The Green Line runs east from Al Riffa to Al Mansoura in the west. There are eleven stations along this line. This project is essential in the delivery of the 2022 FIFA World Cup and is a key contributor to Qatar’s 2030 vision.

Our works in Green Line Metro included:

  1. Management and workforce for the execution of in situ works
  2. Erection and Dismantling of Formwork & Scaffolding works
  3. Fixing of ready-cut and bend steel reinforcement
  4. Pouring and finishing of ready-mix concrete

PROJECT NAME: GREEN LINE METRO “EDUCATION LINE”
LOCATION: DOHA, QATAR
CLIENT: A JOINT VENTURE OF PORR – HBK – SAUDI BINLADEN GROUP
SCOPE: STRUCTURAL WORKS – REINFORCED CONCRETE
DURATION: APRIL 2015 – AUGUST 2015
STATUS: COMPLETED

Related Projects